Pylontech L5000-BAT: 5,016kWh liquid-cooled battery container
- 5,016kWh nominal battery energy
- Liquid-cooled container platform
- Battery-side scope; PCS selected separately

Customized C&I solution — price on request. Estimated lead time: approximately 90 days, subject to confirmation of the final configuration and delivery schedule.
L5000-BAT — system overview
L5000-BAT is a liquid-cooled battery container for large commercial and utility-scale storage. The published reference system capacity is 5,016kWh. This is a DC battery solution rather than a self-contained AC power rating; the external conversion and grid interface are engineered for the project.

Configuration and integration
The 20-foot-format enclosure measures 6,058 × 2,438 × 2,896mm and has a published weight of 43 tonnes. Its battery voltage range is 1,164–1,497V DC. The reference data lists 98% depth of discharge and more than 8,500 cycles, subject to the manufacturer’s operating and test conditions.
Application and project planning
A multi-megawatt-hour container is normally evaluated against dispatch duration, charging windows and the available point of connection. Foundation design, crane access, transport route and auxiliary supply are major parts of the project scope. Liquid cooling and aerosol fire suppression must be considered within the complete installation design.
Configuration notes
The manufacturer notes temperature derating below 10°C or above 40°C and that some certification applications are in progress. No PCS, transformer or grid-connection capacity is implied by the battery energy rating.
Choosing and integrating Pylontech L5000-BAT
A large battery platform for engineered energy storage
L5000-BAT provides a 5,016kWh nominal energy reference in a containerised battery platform. It is intended to be evaluated as part of a complete storage project, where conversion power, grid connection and dispatch controls are specified alongside the battery. The 5MWh-class label describes the size of the energy store; it does not identify a built-in AC inverter rating or establish a turnkey project scope.
Define the PCS and connection architecture early
The battery voltage window, permitted current and communication requirements must align with the chosen PCS. From there, the project team can establish the AC collection arrangement, transformer requirements where applicable, metering and control interfaces. A storage proposal for solar energy shifting can require a different power-to-energy relationship from a project aimed at short-duration demand support. The duty should be defined before choosing the conversion equipment.
Treat delivery and civil works as core project inputs
The reference weight is approximately 43 tonnes, making site access, lifting and foundation planning significant parts of deployment. Assess the transport route and the position of the storage area before fixing the layout. Cooling service access, drainage and the surrounding electrical infrastructure also need space. The quotation should identify which of these works are included and which remain with the site owner or principal contractor.
Where L5000-BAT fits in the energy system
This battery-side product sits within a larger storage installation. Power conversion, AC distribution and grid interfaces must be specified as part of the project; they are not included merely because they appear in this diagram.

Technical reference
Technical data
| General Data | |
|---|---|
| Dimension (W*D*H mm,w/o inverter) | 6058*2438*2896 |
| Weight (tons) | 43 |
| Working Temperature Range (℃) | -20~50* |
| Protection Class | IP55 |
| Altitude (m) | ≤4000 |
| Humidity | 5%~95% |
| Fire extinguishing | Aerosol |
| Cooling System | Liquid Cooling |
| Cooling system consumption (kW, Cooling/Heating) | 38 |
| Aux. Power Consumption (kW, continuous/peak, incl. HVAC) | 40 |
| Anti-corrosion | C3H (C5 Optional) |
Technical data
| Battery Data | |
|---|---|
| System Capacity (kWh) | 5016 |
| Depth of Discharge | 98% (single string) |
| Cycle Life | >8500 |
| DC Voltage Range (Vdc) | 1164~1497 |
Technical data
| Operation Mode | |
|---|---|
| Communication Type | RS485/CAN/Ethernet |
| Operation Logic | Peak Shaving/Energy Shifting/Self-Consumption/Electricity Arbitrage |
Project scope and delivery
Send Solar Deity your load profile, required backup duration, PV capacity, site location and connection requirements. The quotation will define the selected equipment, control interfaces and commissioning scope. Civil works, transport, external switchgear, transformers and installation are included only where expressly listed in the project quotation. The approximately 90-day lead time is a planning estimate rather than a stocked-item dispatch promise.
Manufacturer documentation
Pylontech official product reference
Reference figures apply to the documented configuration and manufacturer test conditions. Confirm the final model revision and applicable regional approvals before procurement.
Monitoring and operational planning
For a L5000-BAT project, define which site measurements, battery status information and alarms are required, who can access them, and how the chosen controls communicate. Gateways, software, network access and remote support should be stated in the quotation rather than assumed.

Pylontech L5000-BAT datasheet and document downloads
Choose the relevant manufacturer document below. Each PDF is hosted on Solar Deity; the language and file size are shown before you open it.
Pylontech L5000-BAT: frequently asked questions
Does L5000-BAT include the PCS?
This listing is for the battery-container family. The compatible PCS and associated AC infrastructure must be identified separately in the project scope.
Can it provide 5MW because it stores about 5MWh?
No. Energy capacity and power are different quantities. Available power depends on battery limits, the selected PCS and the approved system operating conditions.
Can it operate as a standalone off-grid plant?
That requires a complete engineered system, including appropriate conversion, controls, auxiliary supply and operating strategy. A battery container alone does not establish off-grid capability.
What information is needed before delivery planning?
Provide the proposed location, access-route constraints, foundation concept and handling arrangements. The final equipment dimensions and weight should be checked against approved drawings before transport and lifting are arranged.
Where can I get the L5000-BAT datasheet?
Use the document download cards above to open the matched PDF. Check the model, language and revision against the equipment being specified.
Compare the separate Pylontech L3300-BAT reference — model scope and compatibility differ.
Request a project quotation for L5000-BAT
Share your site requirements and the exact product configuration you are considering. Our C&I enquiry form accepts business details, electricity usage and project requirements.