Deye 125kW Commercial Power Conversion System
- Rated power: 125kW
- Battery voltage: 630–1000V
- AC connection: 3L+N+PE
- Maximum efficiency: 98.5%
125kW conversion for commercial battery storage
Deye SUN-125K-PCSL01HP3 is the 125kW power conversion module in the Deye modular commercial ESS family. It connects a 630–1000V battery system to a three-phase 3L+N+PE AC arrangement. Its 98.5% maximum efficiency is a conversion-stage specification, distinct from complete-system round-trip efficiency.

Build the architecture around the required functions
The manufacturer describes integrated zero-export and time-of-use controls and a local colour touchscreen. The wider system uses separate MPPT equipment for solar input and an STS for transfer duties. This modular approach lets the project team specify the conversion, PV and switching functions explicitly instead of treating the PCS as a complete battery cabinet.
125kW conversion within the modular family
The 125kW PCS is intended to be evaluated with the compatible MPPT, transfer and battery equipment. It is distinct from the 125kW GM10 hybrid inverter, which has integrated solar inputs. The related-product cards make it easier to request the correct modular architecture without mixing the two product types.

Key details that shape the system design
Choose the right electrical platform
Battery voltage: 630–1000V
This figure is a starting point for matching equipment. The complete operating range, current capability and supported communication arrangement must also align. For a high-voltage battery module, the complete stack voltage is a separate design value.
Choose a suitable equipment location
Protection: IP65
Consider the enclosure rating together with the manufacturer’s environmental and mounting instructions. Cable entries, ventilation, service access and exposure at the intended position all form part of the installation design.
Designed around the way your system works
The conversion stage in a modular energy-storage system
The PCS manages power conversion between the DC battery side and the AC side of a commercial installation. It is the component to assess when establishing how stored energy can support site demand and how the battery can be charged within the designed operating strategy. It is not the same product as a hybrid inverter with integrated PV tracking.
A modular architecture allows the conversion, solar-input and transfer functions to be selected around the project. That is useful when the required AC power, PV capacity and backup arrangement do not grow in identical steps. The complete design still needs compatible controls, protection and battery equipment.
Size power and duration independently
A business may need substantial power for a short peak, or a lower sustained output over several hours. These are different storage duties. The PCS rating helps define the conversion power, while the battery bank establishes the available energy and contributes its own current and voltage limits.
Start with interval demand data and the circuits that require support. The intended duty may be solar self-consumption, scheduled battery operation or backup, subject to the commissioned system capabilities. The final proposal should show the relationship between load, PCS power, battery energy and the permitted operating window.

Coordinate the PCS with MPPT and transfer equipment
In the Deye modular family, a separate MPPT unit provides the PV tracking function and the STS provides the transfer function. These products have complementary roles rather than interchangeable power ratings. The related-product cards below link to the actual available listings for comparison.
The manufacturer’s system design determines allowable module quantities, communication arrangement, bus configuration and switching behaviour. Do not connect individual modules simply because their headline ratings appear compatible. Use the exact PCS, MPPT, STS and battery references when requesting a project configuration.
Prepare the site for serviceable commercial equipment
Commercial energy equipment needs planned installation space, suitable distribution and practical access for commissioning and maintenance. Review the enclosure dimensions, environmental limits, ventilation and cable routing before ordering. The electrical design should account for the intended grid, generator and essential-load arrangement.
Commissioning should verify power-flow measurement, control communications and the expected operating sequence. Keeping a current equipment schedule and single-line diagram supports later servicing and prevents confusion between the PCS module and a complete packaged storage system.

Where this product fits
Commercial battery storage
Convert energy between a compatible high-voltage storage bank and the AC system within the PCS operating limits.
Load-profile management
Build the storage and control design around the site’s demand pattern and the required duration of the duty.
Modular solar and storage
Use the separately specified PV and transfer equipment where required by the manufacturer’s architecture.
SUN-125K-PCSL01HP3 technical specifications
| Manufacturer model | SUN-125K-PCSL01HP3 |
|---|---|
| Rated power | 125kW |
| Battery voltage | 630–1000V |
| AC connection | 3L+N+PE |
| Maximum efficiency | 98.5% |
| Protection | IP65 |
| Equipment scope | PCS module; MPPT, STS and batteries supplied separately |
Explore the Deye commercial ESS range
These products perform different roles in the modular Deye range. The 100kW and 125kW PCS listings are conversion options; the MPPT and STS provide PV-input and transfer functions. Final model and revision compatibility must be confirmed for the engineered system.

100kW power conversion
SUN-100K-PCSL01HP3
View product
PV tracking and DC input
SUN-MPPT-L01-EU-AM8
View product
Static transfer switching
SUN-STS500L
View productProduct documents & downloads
Your questions about SUN-125K-PCSL01HP3
How should I interpret the output rating?
SUN-125K-PCSL01HP3 is listed at 125kW. This describes power output, while the battery’s kWh figure describes stored energy. Both must be considered when planning backup or daily operation.
Is this a complete solar and battery system?
This listing covers SUN-125K-PCSL01HP3 and its specified function. The PCS, MPPT, STS and battery equipment have separate roles; use the recommended-product cards to explore those components, then confirm the complete configuration for the project.
What information helps Solar Deity recommend a suitable configuration?
Send the SUN-125K-PCSL01HP3 reference together with your existing equipment models, intended application and load profile, required operating period and planned solar or storage capacity. Those details make the discussion more useful than a headline power or capacity figure alone.
Which document should I use for installation?
Use the applicable manufacturer installation or user manual for the exact model and hardware revision. The specification document in the download section supports product selection; a shared family document may cover several variants. Keep the selected model column and the equipment nameplate aligned when preparing the installation.
Plan your next step with Solar Deity
Bring together the right power, storage and operating strategy for your project. Share the SUN-125K-PCSL01HP3 reference and your requirements so our team can help you evaluate a suitable configuration.
Discuss your project






